Home
Download PDF
Order CD-ROM
Order in Print
Section II. BATTERY BOX PREPARATIONS -continued
Section III. INTEGRATED RACK INSTALLATION
TB-9-2320-280-35-12 Installation Instructions for EPLRS Network Manager Vehicle with AMTECH Top Manual
Page Navigation
12
13
14
15
16
17
18
19
20
21
22
TB
9-2320-280-35-12
2-16.
Locate,
mark,
and
drill
two
1.375-in.
diameter
cable
access
holes
(22)
in
battery
box
(2)
rear
wall.
2-17.
Install
grommet
material
(6)
in
cable
access
holes
(22).
1.50
1.50
3.25
22
6
~
2
Figure
5-7.
5-6