TB 9-2320-280-35-12
Section XXV. EXTERNAL POWER RECEPTION BOX INSTALLATION
25-1. Locate, mark, and drill one 0.147-in. diameter hole (1) in right rear wheelhouse (2).
25-2. Using external power reception box (4) as template, locate, mark, and drill four 0.343-in. diameter
holes (3) in right rear wheelhouse (2).
2
~
1
2.25
11.25 TO REAR OF FENDER
Figure 5-60.
2
3
~
17.00 TO REAR OF FENDER
4.25
Figure 5-61.