TB 9-2320-280-35-9
26-3. Position buss bar in battery box (3). Using buss bar as template, locate, mark, and drill three
0.125-in. diameter holes (7) in battery box (3).
26-4. Position shunt in battery box (3). Using shunt as template, locate, mark, and drill two 0.391-in.
diameter holes (6) in battery box (3).
26-5. Position duo-charge in battery box (3). Using duo-charge as template, locate, mark, and drill four
0.391-in. diameter holes (8) in battery box (3).
10.00
6
7
2.00
3
2.00
5.75
~
6.00
8
Figure 5-75.
5-68