TB 9-2320-280-35-11
7-5. Connect wire (8) to existing positive 12V battery terminal end (11) with existing screw (10) and
nut (12).
10
11
12
8
Figure 5-9.
7-6. Position cab enclosure panel (13) in rear floor pan (21) and rear of B-beam (22). Do not secure cab
enclosure panel (13) at this time.
7-7. Route ground cable (17) through battery box hole (6).
7-8. Secure terminal lug (15) to center terminal of terminal board (14) with nut (16), and secure
terminal lug (20) to shunt (19) with existing screw (18).
7-9. Install four additional nuts (16) on terminal board (14).
13
14
15
16
17
18
6
19
~
~
20
22
21
16. PLAIN-ASSEMBLED NUT 271169 QTY. 5
17. GROUND CABLE ASSEMBLY 12480567-1 QTY. 1
Figure 5-10.
5-7