Home
Download PDF
Order CD-ROM
Order in Print
Chapter 1. INTRODUCTION - TM-9-6140-200-140006
Location and Description of Major Components.
Location and Description of Major Components. - continued
Performance Data.
Section Ill. BASIC BATTERY OPERATING PRINCIPLES
Figure 1-2
When the Battery Charges
Test Equipment
Direct Support Battery Shop Hand Held Tester
Section I. OPERATOR/CREW MAINTENANCE INSTRUCTION
Operation Under Usual Conditions.
Operation Under Unusual Conditions.
Section II MAINTENANCE INSTRUCTIONS
Chapter 3. UNIT MAINTENANCE
Preventive Maintenance Checks and Services (PMCS)
General servicing Instructions.
Section II. TROUBLESHOOTING - TM-9-6140-200-140022
Testing Batteries With a 12 volt Battery Load Tester.
COMPENSATING FOR LOW TEMPERATURES:
Figure 3-1
Figure 3-2
Figure 3-3
Optical Tester Maintenance.
Bulb-Type (Hydrometer) Tester.
Bulb-Type (Hydrometer) Tester. - continued
Electrolyte Temperature Correction
Figure 3-6
Water for Use in Batteries.
Battery Removal.
Remove Battery.
Corrosion Inspection
Cleaning - TM-9-6140-200-140037
Battery Installation.
Battery Installation - continued
Battery Installation. - continued - TM-9-6140-200-140040
Battery Installation. - continued - TM-9-6140-200-140041
Battery Installation. - continued - TM-9-6140-200-140042
Transporting Batteries.
Charging Batteries in the Field Using The 3KW Generator Set and Distribution Panel.
Charging Batteries in the Field Using The 3KW Generator Set and Distribution Panel. - continued
Prepare Battery For Charging.
Charging Batteries:
Charging Batteries - continued - TM-9-6140-200-140048
Charging Batteries - continued - TM-9-6140-200-140049
Charging Batteries - continued - TM-9-6140-200-140050
OPERATING INSTRUCTION FOR BATTERY CHARGER MODEL PP-1660E/U
OPERATING INSTRUCTION FOR BATTERY CHARGER MODEL PP-1660E/U - continued - TM-9-6140-200-140052
OPERATING INSTRUCTION FOR BATTERY CHARGER MODEL PP-1660E/U - continued - TM-9-6140-200-140053
Chapter 4. DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE INSTRUCTIONS
Battery Shop SOP.
Battery Post Repair - TM-9-6140-200-140056
Clean battery post
Battery Post Repair - TM-9-6140-200-140058
Battery Post Repair - continued
Early Discharge of New Batteries.
Early Discharge of New Batteries - continued
Charging Storage Batteries (Appx. B-3).
Charging Storage Batteries (Appx. B-3). - continued - TM-9-6140-200-140063
Charging Storage Batteries (Appx. B-3). - continued - TM-9-6140-200-140064
Charging Storage Batteries (Appx. B-3) - continued
Battery Specific Gravity Differences.
Storage of Wet-Charged Batteries.
Storage of Dry-Charged Batteries.
Placing Dry-Charged Battery in Service.
CHARGING BATTERIES
Battery Electrolyte Specific Gravity Test.
Battery Electrolyte Specific Gravity Test. - continued
Chapter 5. SEALED LEAD-ACID BATTERY (GEL)
General Instructions
Replacing open lead-acid batteries in vehicles and equipment with sealed lead-acid batteries. - TM-9-6140-200-140075
Replacing open lead-acid batteries in vehicles and equipment with sealed lead-acid batteries. - TM-9-6140-200-140076
Replacing open lead-acid batteries in vehicles and equipment with sealed lead-acid batteries - continued
Replacing open lead-acid batteries in vehicles and equipment with sealed lead-acid batteries. - TM-9-6140-200-140078
Recharging.
Recharging. - continued
Initial Charging.
Vehicle Power System Charging.
Withdrawal From Use and Storage.
Transportation. - TM-9-6140-200-140084
Chapter 6. BATTERY DISPOSITION AND DISPOSAL
General Requirements.
Characterization of Batteries.
Transportation. - TM-9-6140-200-140088
Recycling.
Solid Waste Characterization. - TM-9-6140-200-140090
Storage.
Disposition and Disposal.
Reference
Reference - continued - TM-9-6140-200-140094
Reference - continued - TM-9-6140-200-140095
Reference - continued - TM-9-6140-200-140096
Appendix A. REFERENCES - TM-9-6140-200-140097
Appendix B. MAINTENANCE ALLOCATION CHART - TM-9-6140-200-140098
Maintenance Functions.
Explanation of Columns in the MAC, Section II.
Explanation of Columns in the MAC, Section II - continued
Explanation of Columns in Tools and Test Equipment Requirements, Section III.
Section II. MAINTENANCE ALLOCATION CHART - TM-9-6140-200-140103
TOOLS AND TEST EQUIPMENT REQUIREMENTS
TOOLS AND TEST EQUIPMENT REQUIREMENTS - continued
Section IV. REMARKS - TM-9-6140-200-140106
Appendix C. EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST
Section II. EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST
Section II. EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST - continued
Appendix D. GUIDANCE FOR LOCAL BATTERY SHOP SOP
Personnel Limits.
Leading Operations.
Personal Protection Clothing Equipment (OSHA Approval Equipment).
Procedure. - TM-9-6140-200-140114
TYPICAL BATTERY SHOP LAYOUT
Appendix E. Procedures For Draining Lead-Acid Batteries and Disposition of Drained Sulfuric Acid (Electrolyte)
Draining
Disposition and Transportation
Appendix F. Disposal Requirements by State
Appendix F. Disposal Requirements by State - continued - TM-9-6140-200-140120
Appendix F. Disposal Requirements by State - continued - TM-9-6140-200-140121
Appendix F. Disposal Requirements by State - continued - TM-9-6140-200-140122
Appendix F. Disposal Requirements by State - continued - TM-9-6140-200-140123
Appendix G. GLOSSARY
Appendix G. GLOSSARY - continued - TM-9-6140-200-140125
Appendix G. GLOSSARY - continued - TM-9-6140-200-140126
TM-9-6140-200-14 Lead-Acid Storage Batteries Manual