TB 9-2320-280-35-10
INSTALLATION PROCEDURES
Section I. SCOPE
This chapter provides instructions for installation of C4ISR items in the vehicle. When installing C4ISR
equipment, be sure to read and follow instructions and illustrations carefully.
Section II. INSTALLATION OF TERMINAL BOARDS
Use the following procedure to install additional terminal boards to provide adequate power connections.
Section III. PANEL MODIFICATIONS
NOTE
For vehicles without cab enclosure panel, begin with step 3-1 and
For vehicles with cab enclosure panel, begin with step 3-3.
All dimensions are in inches.
3-1. Place cab enclosure panel (3) in position. Locate, mark, and drill five 0.159-in. diameter holes
marked A and B in B-beam (1) and battery box (2).
3-2. Enlarge two lower mounting holes marked A to 0.390-in. diameter, and install two inserts (4) in
battery box (2).
2
1
B
~
B
B
A
3
A
4
3. CAB ENCLOSURE PANEL 12447141 QTY. 1
4. INSERT 12446871-2 QTY. 2
Figure 5-1.