TB 9-2320-280-35-10
31-48. Route red cable (87) from stud (85) of
solenoid (19) to
control box. Secure cable (87) to
solenoid (19)
with nut (86).
31-49. Route green cable (88) from shunt (11) to control box. Secure green cable (88) to shunt (11) with
screw (89).
31-50. Route orange cable (91) from shunt (11) to control box. Secure orange cable (91) to shunt (11) with
screw (90).
5-92