TM5-6130-301-13&P
REPAIR PARTS AND SPECIAL TOOLS LIST
Section I. INTRODUCTION
C-1. SCOPE. This manual lists spares and repair parts; special tools; special test, measurement, and diagnostic
equipment (TMDE), and other special support equipment required for performance of operator, organizational,
and direct support maintenance of the Distribution Panel. It authorizes the requisitioning and issue of spares
and repair parts as indicated by the source and maintenance codes.
C-2. GENERAL. This Repair Parts and Special Tools List is divided into the following sections:
a. Section II. Repair Parts List. A list of spares and repair parts authorized for use in the performance of
maintenance. The list also includes parts which must be removed for replacement of the authorized parts. Parts
lists are composed of functional groups in numeric sequence, with the parts in each group listed in figure and
item number sequence. Bulk materials are listed in NSN sequence.
b. Section III. Special Tools List. Not applicable.
c. Section IV. National Stock Number and Part Number Index. A list, in National Item Identification
Number (NIIN) sequence of all National Stock Numbers (NSN) appearing in the listings, followed by a list, in
alphametic sequence, of all part numbers appearing in the listings. National stock numbers and part numbers
are cross-referenced to each illustration figure and item number appearance. This index is followed by a cross-
-reference list of reference designators to figure and item numbers.
C-3. EXPLANATION OF COLUMNS.
a. Illustration. This column is divided as follows:
(1) Figure Number. Indicates the figure number of the illustration on which the item is shown.
(2) Item Number. The number used to identify each item called out in the illustration.
b. Source, Maintenance and Recoverability Codes (SMR).
(1) Source Code. Source codes indicate the manner of acquiring support items for maintenance, repair of
overhaul of end items. Source codes are entered in the frost and second positions of the Uniform SMR
Code format as follows:
Definition
Code
Item procured and stocked for anticipated or known usage.
PA
Item procured and stocked for insurance purpose because essentiality dictates that a
PD
minimum quantity be available in the supply system.
Item procured and stocked and which otherwise would be coded PA except that it is
PC
deteriorative in nature.
Support item, excluding support equipment, procured for initial issue or outfitting and
PD
stocked only for subsequent or additional initial issues or outfittings. Not subject to
automatic replenishment.
PE
Support equipment procured and stocked for initial issue or outfitting to specified
maintenance repair activities.