TB 11-6135-200-25
g. Storage Inspection Records.
Results of
B-8. Other Instructions.
inspections and tests shall be recorded on data sheets
and a copy attached to each unit.
a. Rejected Lots. Each rejected lot shall be tagged
and reclassified into the proper condition code in
accordance with AR 725-50.
For other than raw
material, all defective units in a lot shall be repaired, or
a. Controlled humidity warehouse: 60 months.
disposition requested in accordance with AMC and depot
b. Heated warehouse: 36 months.
procedures.
c. Unheated warehouse: 18 months.
b. Repackaging of Samples Inspected. Restore
the packaging of the samples inspected and accepted to
B-7. Type of Storage
the level of the lot from which the samples were drawn.
Controlled humidity warehouse, heated, warehouse, or
unheated warehouse.
By Order of the Secretary of the Army:
JOHN A. WICKHAM JR.
General, United States Army
Chief of Staff
Official:
ROBERT M. JOYCE
Major General, United States Army
The Adjutant General
DISTRIBUTION:
To be distributed in accordance with DA Form 12-32, Organizational Maintenance requirements for Nike Hercules
Improved Missile System and Pershing Missile System.
34