TB 9-2320-280-35-11
Section XXXI. RIGHT EPLRS ANTENNA CABLE INSTALLATION
31-1. Route cable (2) from connection box (1) down tool box (3) into rear hole (4) of left wheelwell (5).
31-2. Route cable (2) along existing harness (7) to right wheelwell (6).
31-3. Route cable (2) under right wheelwell (6) with existing clamps (9) and screws (8).
31-4. Route cable (2) through grommet (10) of right wheelwell (6). Secure with clamp (11) and
self-tapping screw (8).
31-5. Route cable (2) down outside of wheelwell (6) along C-beam (16) and through hole (15) in frame (14)
of multi-net rack (13).
31-6. Route cable (2) up side of multinet rack (13) to vicinity of right-side EPLRS mount (12). Secure
with clamps (17) and self tapping screws (18).
2
1
3
4
~
5
~
9
~
9
8
7
6
8
2. ANTENNA CABLE SM-C-911480 QTY. 1
Figure 5-83.