TB 9-2320-280-35-9
NOTE
All previously routed cables have been removed from figure 5-72
for clarity.
Procedure shows routing for one INC-EPUU cable. Routing for
second INC-EPUU is similar.
25-35. Route INC-EPUU cable (1) forward under integrated rack (3), up through center access hole (2),
and rest on SINCGARS mount (44).
25-36. Take all slack out of all cables and store under EPLRS mount assembly.
25-37. Tighten all screws on all clamps.
25-38. Secure right-side tunnel insulation (43). (Refer to TM 9-2320-280-20.)
44
1
2
~
3
1
43