TM 11-6130-392-34
Table 4-4. Performance Test Procedures-Continued
Column 3
Column 2
Column 1
Reference, or Instruction
Acceptable TEST RESULT
Test Procedure
Go to step (17)
All tests were passed.
(16) If performance tests are now com-
pleted, turn POWER switch to OFF.
Remove power cable from 115 VAC
source. Remove band from interlock
switch and remove clip leads from
REMOTE BATTERY jacks. Assem-
ble retainer and cover set controls
POWER ON lamp lights.
(17) Connect power cable to 115 VAC. Set
POWER switch to ON.
(18) Set POWER OFF, disconnect power
cable, return battery charger to serv-
ice.
4-27
--