TB 9-2320-280-35-10
Section XXV. PLGR BRACKET INSTALLATION
25-1. Install PLGR bracket (11) on integrated rack (1) with four screws (12).
25-2. Locate, mark, and drill one 0.201-in. diameter hole (10) in right-side engine tunnel (9).
25-3. Remove paint from vicinity of hole (4) on integrated rack (1) and hole (10) on right-side engine
tunnel (9). Apply anti-seize compound as required.
25-4. Fabricate ground strap (5) from 8.00-in. length of braided wire and two terminal lugs.
25-5. Install ground strap (5) on
integrated rack (1) with
capscrew (6), three lockwashers (2), and nut (3).
25-6. Install ground strap (5) on right-side engine tunnel (9) with self-tapping screw (8) and two
2
5
6
7
8
4
3
1
2
~
9
10
11
2. LOCKWASHER MS45904-68 QTY. 3
3. NUT 9419143 QTY. 1
12
5. GROUND STRAP
BRAIDED WIRE AA59569F30T0375 QTY. A/R
TERMINAL LUG MS20659-129 QTY. 2
6. CAPSCREW B1821BH025C100N QTY. 1
7. LOCKWASHER MS35338-43 QTY. 2
8. SELF-TAPPING SCREW 9426241 QTY. 1
11. PLGR BRACKET 986-0645-001 QTY. 1
12. SCREW MS35206-263 QTY. 4
Figure 5-72.