TB 9-2320-280-35-11
NOTE
Loosen right-side tunnel insulation. (Refer to TM 9-2320-280-20.)
34-8. Route INC-EPUU cables (2) and power cables (3) forward along tunnel edge (20) and under
B-beam (18), and secure to tunnel edge (20) with existing screws (17) and clamps (19).
17
2
3
18
~
19
20
Figure 5-96.
5-70