TB 9-2320-280-35-11
NOTE
All previously routed cables have been removed from figure 5-99
for clarity.
34-14. Route INC-EPUU cable (2) forward under integrated rack (35), up through center access hole (34),
and rest on SINCGARS mount (33).
34-15. Take all slack out of cables and store cables under EPLRS mount assembly.
34-16. Tighten screws on all clamps.
34-17. Secure right-side tunnel insulation (36). (Refer to TM 9-2320-280-20.)
33
2
34
~
35
2
36