TB 9-2320-280-35-9
Section XXV. EPLRS CABLES INSTALLATION
NOTE
Loosen tunnel insulation before performing steps 25-1 and 25-2.
(Refer to TM 9-2320-280-20.)
SINCGARS model AN/VRC-92F shown.
25-1. Route INC-EPUU cable (1) from integrated rack (3), down through center access hole (2), and under
left-side tunnel insulation (5) towards rear of vehicle.
25-2. Route power cable (4) from rear battery box forward and under integrated rack (3) and under
left-side tunnel insulation (5) towards rear of vehicle.
25-3. Secure left-side tunnel insulation (5). (Refer to TM 9-2320-280-20.)
1
2
5
3
4
TUNNEL
INSULATION
1. INC-EPUU CABLE A3279383-3 QTY. 1
4. EPLRS POWER CABLE A3004939 QTY. 1
Figure 5-65.