Section IV. MAINTENANCE PROCEDURES
4-10. GENERAL. Disassembly and reassembly for
most of the
components of the
Battery Charger Distribution
Panel generally involves no more than removal of attached hardware, and lifting or sliding the component from
the panel.
a. Disassembly. (Figure 4-1)
(1) Boot, circuit breaker. Remove two phillips head screws that secure circuit breaker boot (9) and
retaining plate and remove circuit breaker boot.
(a) Loosen panel fastener screw (1) and open panel (2).
(b) Remove power leads from meter (3) and remove screws and attaching hardware from meter.
(c) Remove meters from panel.
(3) Circuit breaker (top row).
(a) Loosen panel fastener screws (1) and open panel (2).
(b) Remove bus bar connectors ('7).
(c) Remove screw and nut attaching bus bar jumper (8) from bus bars (5).
(d) Remove nuts and washers connecting bus bars (18) to circuit breakers.
(e) Remove screws, nuts, hardware from bus bar supports (4) and remove bus bars (8 and 18).
(f) Remove circuit breaker power lead.
(g) Remove phillip head screws that secure circuit breaker boot (9) and circuit breaker, to panel.
(h) Remove circuit breaker by tilting upward.
(4) Circuit breaker (bottom row).
(a) Loosen fastener screws (1) and open panel (2).
(b) Remove attaching hardware from heat sink bridges (10) and bus bar ground (11).
(c) Remove attaching screws and nuts from bus bar (5).
(d) Remove attaching screw and nut from bus bar jumper (8) and remove bus bar (5).
(e) Remove circuit breaker power lead.
(f) Remove two phillips head screws that secure circuit breaker boot (9) and circuit breaker to panel.
(g) Remove circuit breaker by tilting upward.
(5) Receptacle assembly.
(a) Loosen panel fastener screw (1) and open panel (2).